Skip to content
Warehouse
4 min read
Featured

When spreadsheet-based pallet planning stops scaling

A planner kept the cartons in a spreadsheet. A supervisor copied that list onto a sheet. Shipping built the pallet from memory. Warehouse nesting replaced that in October 2024.

TNH TechnologyJaipur
November 18, 2026

A planner kept the cartons in a spreadsheet. A supervisor copied that list onto a sheet. Shipping built the pallet from memory of the last order. That is the point where a spreadsheet stops being a plan and becomes a second copy of the work.

The planner's spreadsheet

The count lived in the file. Planners assigned pallets and cartons by hand. The file was right when someone saved it, and wrong as soon as a carton moved and the sheet did not.

The supervisor's copy

A supervisor copied that list onto a sheet. The floor then had two versions of the same cartons: the planner's file, and the paper in the supervisor's hand. Neither one was the screen an operator opens at the station.

Shipping from memory

Shipping built the pallet from memory of the last order. The assignment was not in the system that held the stock. It was in the last load someone remembered.

What replaced it

The nesting routine proposes a pallet and carton assignment from the stock in the system. A person confirms the proposal. The floor keeps the final decision. The system finished in October 2024. Eight months. Nine people. The client is a manufacturing and logistics company, and the name is withheld.

The write-up is the warehouse case study. The service page is warehouse software.

PalletIQ is a free calculator for one load. It returns cartons per layer, layers, and pallet count. It does not assign stock on a station, and it does not replace the October system.

When the floor needs assignment and stock, book a project call. We reply within one business day.

Tags:Warehouse softwarePallet planning

Book a project call

Tell us your role, the timeline, and the budget.

info@tnhtechnology.com

Your project

Same team on UI, application, and database
Warehouse and shipping systems already shipped
PalletIQ you can try before the call
A written plan before the build starts

What happens next?

1

You tell us what you need

2

A direct reply, not a ticket number

3

A call, then a written plan

Book a project call

We reply within one business day.

Protected by reCAPTCHA